The launch of the first phase of the Sg Buloh-Kajang Line this Friday will see 12MRT stations open for commuters – Sg Buloh, Kampung Selamat, Kwasa Damansara, Kwasa Sentral, Kota Damansara, Surian, Mutiara Damansara, Bandar Utama, Taman Tun Dr Ismail, Phileo Damansara, Pusat Bandar Damansara and Semantan. The entire line is expected to serve some… Read More


Fares for MRT Sungai Buloh-Kajang (SBK) line will start from RM1 to RM5.50 based on the cashless fare structure, and from RM1.10 to RM6.40 based on the cash fare structure. Rapid Rail Sdn Bhd (Rapid Rail) in a statement said the maximum fare would cover the full distance between Sungai Buloh and Kajang, spanning 51km… Read More